← All services
CERTILEC / Electrical protection testing

Verify the protection response.

Targeted tests compare settings, trip logic and expected results.

Discuss your project ↗
01

Client situation

Relays to verify after installation, setting changes or unexpected operation.

02

Proposed work

Review approved settings, plan tests, perform secondary injection and check the trip path.

03

Deliverables

Result sheets, measured times, deviations and test report.

Electrical protection testing

Work within this service

01

Setting review

Collect parameters and compare with approved coordination studies.

02

Test plan

Identify functions and thresholds based on relay, drawings and site conditions.

03

Secondary injection

Test relevant protection functions with suitable equipment.

04

I/O & trip chain

Check signals, contacts and trip path under safe conditions.

05

Operating time

Measure response against tested function settings.

06

Test report

Results, deviations and recommendations for correction or retest.

Projects and technical references

Industrial LV/MV networks: fault and selectivity studies inform approved settings before relay and trip-path testing.

IEC 60909 may guide short-circuit calculations; tests follow relay functions, approved settings and site procedures.

CERTILEC / Electrical protection testing

A scope tailored to your site

Specific tests, calculations and deliverables are agreed after reviewing your needs and site conditions.

Discuss your project ↗

Have an electrical project in mind?

Let's discuss your goals and the scope of your needs.

Contact us ↗